Monday, February 6, 2012

The Finish Line

January has been a busy month in Lake George.  Carpentry and interior trim skills were put to the test to install new doors, install baseboard and close out other trim projects.  The carpet and vinyl flooring was installed and the last plumbing fixtures were connected.  Cleaning and paint were also wrapped up.

Keith, Nicole, Matt, and Dave after a long Saturday's work
Jason fits an extension jamb for the front door while Keith looks on.

John removes the protective floor covering, revealing a very attractive vinyl floor.

At some points it felt like there would be no end to the painting.

Keith's door fitting station in the basement.
Pine and oak cap for the short wall at the top of the stairs.

Main stair handrail

Main stairs with removable rail system installed

John's gift from his "coffee shop buddies.