Sunday, November 15, 2009

Weekend Sixteen,Seventeen














This week I'm combining two weekends into one blog.

I was not there last weekend(Nov. 7th) , but can tell you that the trim work was continued and all the walls and ceilings were touched up with joint compound and painted where necessary.
The closets were all accessorized with closet maid wire shelving and the appliances arrived for installation.
The storage unit was started to be cleaned out in anticipation of being removed from the work site in the next few weeks.

This past weekend , 99% of the trim work was installed, puttied,and painted. The electrician from Reddon Electric completed most of the final connections and installs of electrical fixtures.
Hardware was installed on all the interior doors and the house was thoroughly cleaned in anticipation of carpet being installed this week by Carpetland.
Once the countertop is fabricated by Curtis Lumber, we will install it and then our plumbers can come in and complete all plumbing fixture installations.

We are getting very close to completion at 17 Medbury Rd. and I know Rachel and McKenzie are anxious to move into their new home.

I would like to personally thank ALL the many volunteers , organizations and companies that have contributed to this great cause.
In tough economic times that we are all facing these days, it is truly inspiring to see people come together for a common cause such as this an accomplish it in such a short amount of time.


THANK YOU, THANK YOU, THANK YOU from the Habitat For Humanity BLOGGER!!!!

Sunday, November 1, 2009

Weekend #15





The crew from Skidmore College was once again at work at 17 Medbury Rd.
The tasks at hand were installation of the interior doors and once these were in, the team filled in the nail holes, painted the door slabs and also the door frames.
The exterior doors were also painted along with the frames. While this work was being done , the storage shed out back was finally completed and painted.
This should complete all the exterior work at 17 Medbury with the exception of final grading and landscaping which will be done in the spring.
The electrical fixtures are being installed and the kitchen cabinets were also hung this week.
Vinyl flooring was installed courtesy of Carpetland Flooring.
Next week the trim work will be installed , nail holes filled and misc. touching up of walls and trim.
Hope to see you all next Saturday. Thanks for making Rachel and MacKenzie's dream a reality!!!
A special thanks goes out to the Girl Scout Troop 3074 from Glens Falls for supplying the Habitat crew with an awesome lunch!! The food was excellent.